What should I send for a dual-level ONT shield box RFQ, and how is it accepted?
Send the target ONT, the test items and frequencies, the unit count per level, the connector list, the control sequence, the target cycle time, and the on-site air and power conditions. Acceptance should cover layout and motion, optical and data connections, shielding and inter-level influence, path calibration, temperature, and the complete sequence. Dimensions, shielding figures, air supply, and communication settings belong in the confirmed proposal and are judged against the delivered version and its records, not against product photographs.
Key points
- RFQ inputs: ONT model, test items and frequencies, units per level, connector list, control flow, cycle time, site air and power
- Acceptance covers layout and motion, not only the shielding number
- Inter-level influence is verified separately from absolute shielding effectiveness
- Optical and data connections are part of acceptance, because they determine what can be tested
- Buy against the confirmed proposal and delivery records, not photographs