How do CPK and GRR prove a test system can be trusted?

Use GRR first to measure how much of the tolerance the measurement system consumes: below 10% is acceptable, 10–30% is conditionally acceptable, above 30% is not acceptable, and the number of distinct categories should be at least 5. Then use Cpk or Ppk for process capability, where volume production usually requires Cpk ≥ 1.33. If GRR fails, a Cpk calculated from the same data cannot be used in a commitment to a customer.

Key points

Products this applies to

PCBA functional test system with drawer-type fixture and interchangeable probe modules

PCBA Functional Test System (FCT)

A functional circuit test system for 3C product PCBA after SMT, providing test and firmware programm…

Discuss this configuration

Send the device details and the measurement you need to make. We will confirm which specifications are fixed and which need verification on your sample.

Contact engineering