How do I calculate OEE on RF test equipment and schedule preventive maintenance?

OEE is availability multiplied by performance multiplied by quality, and it only works if changeover, breakdown, waiting for material, and retest losses are recorded separately — otherwise the number hides where the time went. Schedule preventive maintenance on two triggers: running hours and calendar interval. Inspect fixtures, probes, enclosure seals, and connectors, and hold safety stock of the parts that wear.

Key points

Products this applies to

Dual-position drawer RF shield test station with instrument bay and touchscreen

Dual-Position Drawer RF Shield Test Station

A self-contained test station combining two drawer-type shielded cavities, an instrument bay, and an…

Discuss this configuration

Send the device details and the measurement you need to make. We will confirm which specifications are fixed and which need verification on your sample.

Contact engineering

Related questions